60 active projects. ₹143.78 Cr order book. 17 zones.
A pan-India order book of AMC, SITC and outsourced O&M contracts with the Indian Railways.
Featured projects.
Drawn from the live project list as on December 2025. The full order pipeline of ₹20,251 lakhs has ₹14,378 lakhs of balance work yet to be served — visible in the order book table further down this page.
AMC for Tower Wagon Engines & DG Sets
Largest single service category in the order book — ₹3,137 lakhs of ongoing AMC contracts for OHE Tower Wagon engines and Power Car DG sets across zones.
Power Car Equipment Repair & Maintenance
₹2,668 lakhs of repair and maintenance work covering Power Car DG sets, electrical distribution, battery banks and circuit protection on conventional coaches.
Escorting, Troubleshooting, Calibration & Testing
Specialised on-train escorting and field-engineering services valued at ₹3,008 lakhs — real-time diagnostics, fault identification and on-site troubleshooting.
Train Lighting Equipment AMC
Repair and maintenance of LED interior, emergency lighting, wiring and battery backup across the fleet — ₹1,748 lakhs in active contracts.
HVAC Systems Repair & Maintenance
₹1,259 lakhs of HVAC AMC across LHB and ICF passenger coaches — air filters, blower motors, ducts, fans and OEM-spec component replacement.
Mobile Charging Points Programme
Provision of additional mobile charging points across railway coaches — ₹1,012 lakhs in supply, installation and commissioning work.
Wiring & Non-Core Coach Servicing
₹1,542 lakhs covering wiring work and non-core servicing of fans, lights, batteries and switches across passenger coaches.
₹14,378 lakhs of balance work as on December 2025, broken down by service category. Tower Wagon & DG Set AMC and Power Car maintenance together account for over 40% of the book.
| Service category | Active value (₹ lakhs) | % of book |
|---|---|---|
| AMC for Tower Wagon Engines & DG Sets | 3137.17 | 21.8% |
| Escorting, troubleshooting, calibration & testing | 3008.78 | 20.9% |
| Repair & maintenance of Power Car equipment | 2668.65 | 18.6% |
| Repair & maintenance of train lighting equipment | 1748.65 | 12.2% |
| Wiring work & non-core coach servicing | 1542.49 | 10.7% |
| Repair & maintenance of HVAC systems | 1259.44 | 8.8% |
| Provision of additional mobile charging points | 1012.83 | 7.0% |
| Total | 14,378.01 | 100.0% |
DRPL serves 17 Indian Railways zones. Western Railway is the largest zone in the book at ₹3,914 lakhs, followed by Central, East Coast and South Eastern.
| Railway zone | Total order value | Balance to serve |
|---|---|---|
| Western Railway | 3914.68 | 3197.79 |
| Central Railway | 2853.96 | 955.36 |
| East Coast Railway | 2562.92 | 1504.65 |
| South Eastern Railway | 1562.38 | 1352.28 |
| Eastern Railway | 1529.64 | 1178.20 |
| North Central Railway | 1190.00 | 574.82 |
| South East Central Railway | 1146.79 | 1146.79 |
| Northern Railway | 971.89 | 806.06 |
| East Central Railway | 745.06 | 353.49 |
| North East Frontier Rly. | 722.68 | 605.95 |
| South Central Railway | 674.62 | 532.24 |
| North Western Railway | 558.10 | 558.10 |
| West Central Railway | 488.55 | 488.55 |
| North Eastern Railway | 446.50 | 258.28 |
| Southern Railway | 407.26 | 388.58 |
| Northeast Frontier Rly. | 251.01 | 251.01 |
| South Western Railway | 225.86 | 225.86 |
| Total | 20,251.90 | 14,378.01 |